Featured Projects

Techno Economic Feasibility Study, Master Planning and Design of Infrastructure Services of Green Agro Allied Economic Zone, Abuja Kaduna Expressway, Kaduna (1510 Ha), Kaduna, Nigeria

  • Techno Economic Feasibility Report

  • Market Research

  • Master Planning

  • Design of Infrastructure Services like Road, Water Supply, Sewerage, Drainage, electrical distribution System, Street lighting, WTP, ETP. Etc.

  • Design of Social Infrastructure Services

  • BoQ, Cost Estimation and Preparation of Tender Documents

Development of Katsina Green Industrial Park, 800 Hectare (2000 Acres) at Katsina, Nigeria

  • Techno Economic Feasibility Report

  • Market Research

  • Master Planning

  • Design and Detailed Engineering of Infrastructure Services

  • Design of Social Infrastructure Services

  • BoQ, Cost Estimation and Preparation of Tender Documents

  • Site Inspection

Services Designed

Road Network, Water Supply System, Sewerage Network, Storm Water Drainage, WTP and CETP, Boundary Wall, Gate Complex, Electrical distribution system, Sub-stations, Street Lighting, Single Window Clearance Building, Landscaping

Industrial Clusters Designed

  • Solar Park

  • Multi Model Logistic Park (MMLP)

  • General Engineering Cluster

  • Fashion / Apparel Cluster

  • Multi Product Cluster

  • Mega Food Cluster

  • Animal Food Processing Cluster

  • Flatter Factory Cluster

Techno Economic Feasibility Study, Master Planning and Design of Infrastructure Services of Green Economic Zone, Maraban Jose, Kaduna (310 Ha), Nigeria

  • Techno Economic Feasibility Report

  • Market Research

  • Master Planning

  • Design of Infrastructure Services like Road, Water Supply, Sewerage, Drainage, electrical distribution System, Street lighting, WTP, ETP. Etc.

  • Design of Social Infrastructure Services

  • BoQ, Cost Estimation and Preparation of Tender Documents

Development of Textile Park (33 Acres) at Ranchi, Jharkhand for Orient Craft Ltd.

  • Master Planning

  • Design and Detailed Engineering of Infrastructure Services

  • Design of Social Infrastructure Services

  • BoQ, Cost Estimation

  • Preparation of Tender Documents

  • Procurement Support to client in awarding works and arranging materials.

  • Project Management

Services Designed

Road Network, Water Supply System, Sewerage Network, Storm Water Drainage, WTP and CETP, Boundary Wall, Gate Complex, Electrical distribution system, Sub-stations, Street Lighting etc.

Preparation of DPR of 2 Bus Terminals in Andaman & Nicobar and Tripura, India

  • Preparation of Layout plans of New Bus Terminals

  • Planning of Internal circulation pattern-flow of passengers, vehicles and other vehicles, Requirements for vehicle bays, fuel station and maintenance depot, facilities and amenities required for passengers, commercial space etc.

  • Assessment of utilities: Power, water, rainwater harvesting, HVAC, ETP etc.

  • Prepare 3D views of the concept plan

  • Modify the conceptual designs incorporating changes and prepare the preliminary drawings, sketches, study model for approval of client along with cost estimates.

  • Detailed design and layouts for all architectural and structural work, Schedule of finishes

  • Preparation of BOQ and estimation of Project Cost as per the prevailing Schedule of Rates for the state.

  • Development of Technical schedules of the EPC agreement

  • Providing assistance in bid process management

Feasibility Study of Two Bus Terminals in Punjab and UP, India

  • Site assessment and potential connectivity with other modes of transport

  • Utilities assessment like power and water availability

  • Analysis of traffic movement and collection of primary data viz. vehicle trips, vehicle schedule, entry fee etc.

  • Environmental issue and mitigation measures

  • Study of local development plans, building by-laws, city development plan etc.

  • Identification of commercial development in the site vicinity, collection of real estate primary data e.g. Rentals for shops, Office spaces, malls, circle rate and market rates assessment etc.

  • Identification of issues impacting the site feasibility for proposed development of project site and suggesting measures to improve the site feasibility.

Design Review, Project management and Construction Supervision of BPCL Gas Pipeline Shifting work for NHAI in NCR (Dwarka Expressway)

  • Taking all approval from BPCL / NHAI for the pipe procurement

  • Design review and Value Engineering

  • Review and Approval of drawings and documents submitted by Supplier and Contractor

  • Review of Contractor’s shop drawings and providing approval

  • Scheduling and Budgeting

  • Full time Construction Supervision and bill certification

  • IQuality assurance and quality control

  • Environment, Health and Safety Management

  • Monitor & Supervise Testing and Commissioning of pipelines

  • Final bill certification and getting as built drawings prepared

Electricity Consultancy Services and Engineering Support for External Electrification work and low voltage works of Suncity Hitech Township at Vrindavan Mathura

  • Preparation of design drawings showing high tension, low tension system and distribution etc. as per preliminary design report

  • Preparation of Schematic diagram for power distribution and low voltage system, lighting arrestors etc.

  • Preparation of coordinate working drawings of all types of electrical systems as per preliminary report.

  • Preparation of Detailed cost estimates on the basis of the market rates

  • Tender documents including special conditions of contract, technical specifications and detailed scheme of quantities on the basis of approved drawings.

  • Providing all required technical assistance to arrange the approvals of all systems from the client.

Feasibility Study for Development of Medical and Health Park on 400 acres area in UP

  • Need assessment of Medical & Health Park

  • Preparation of Conceptual layout

  • Details of various units and facilities required – Super-specialty hospitals, National Centre for Infectious Diseases, Medical College, Nursing College, Ayurvedic/ Yunani/ specially hospitals, Diagnostic facilities, Clinical Support Services, Wellness Centre, Research & Development Centre, Herbal Park, Residential Township, Hotels, Commercial complex, Amenities and Utilities, Helipad etc.

  • Infrastructure requirement- Road, Water Supply, Sewerage, Drainage, Streetlight, Solar Power, Bio Medical Waste Treatment, STP, ETP etc.

  • Area Break up, Zoning & Circulation

  • Infrastructure Development Cost

  • Project Structure and various development models

Feasibility Study of Four Food/ Agri Processing Plants (Banana, Tomato, Potato & Cashew) in Senegal, Africa

  • Industry overview and Sector analysis

  • Raw material and availability, Value Chain assessment

  • Global and regional production and consumption analysis

  • Detailed supply chain analysis including small scale farmers, farmer groups, Cooperative, SHG, Traders, Exporter etc.

  • Details of Field collection centers, Primary processing centers, Processing centers, warehouse, cold storage, market etc.

  • Market Potential – Present Market Position and Expected future demand

  • Integrating smallholder farmers to market approach

  • Backward and forward linkages of/from products to market processing

  • Manufacturing Process, Process flow sheet diagram, plant layout

  • Details of capital investment: Land and site development cost, Buildings and Civil Works, Plant and Machinery, Miscellaneous fixed assets

  • Project Economics and profitability analysis

Pre-bid Consultancy Services for Vikram Udyogpuri Infrastructure Development Project in Ujjain, MP.

  • Preparation of detailed BOQ with description of all items of the tender document (co relating with specifications and tender drawings)

  • Preparation of Design Basis Report (DBP)

  • Preparation of Detailed cost estimates on the basis of the market rates

  • Preparation of broad technical data of equipment required in the project

  • Detailed Schedule of items and submission of quantity take off sheets

  • Market Potential – Present Market Position and Expected future demand

Develop Enterprise based Plastic Collection System with focus on Inclusion activities for Informal Waste Sector in Multiple Cities across India

  • Key objectives of this assignment is to identify, invest and build a systematic plastic collection systems and streamlining activities in informal collection system through focus on inclusion activities for informal waste sector.

  • Focus states - Maharashtra, Delhi, Rajasthan, Haryana, Andhra Pradesh, Telangana, Karnataka, West Bengal, Kerala, Uttar Pradesh, Madhya Pradesh, Orissa and Tamilnadu.

  • Reach out and Collection Target

    • Total in 4 Years : 85,000 Tons
    • First Year: 10,000 Tons
    • 250 Informal aggregator

Project Management Consultancy for various CNG Gas Stations of IGL

  • Planning, Scheduling & Reporting of timelines for timely completion of activities.

  • Detailed Engineering of CNG stations which includes provision of recommendation and improvements, monitoring individual tasks and optimize site procedures.

  • Preparation and improvements of Construction Procedures, Quality Assurance Manual, SOPs, QAPs & ITPs etc.

  • Review contractor’s resources and schedule on daily basis and Coordinate with contractors/ IGL.

  • Carry out construction supervision activities based on approved construction drawings.

  • Inspection of day-to-day activities at site and signing of reports.

  • Assist in lesioning with land owning agencies and day to day coordination with authorities.

  • Follow up with vendors for As Built drawings/ documents, review/ approve and forward the same to IGL with in the stipulated time.

Independent Engineer for Municipal Solid Waste Management Project, Dehradun

  • BOT project of Waste Processing plant

  • Pre-dispatch material supervision

  • Construction quality supervision of trommels, sanitary landfill for 200 TPD waste to compost plant

  • Billing Certification

  • Weigh bridge supervision

  • QA/QC

Transaction Advisory Services for a Waste to Energy Plant in India

  • Due diligence of the waste market in the catchment area of the target asset

  • Technical due diligence of the plant and its operations

  • Coordination with various other advisors

  • Interface with Seller and bank for the closure of deal

  • Advise on local issues and other operational issues related to project

Consultancy services for obtaining Environment Clearance for Commercial Project in Faridabad

  • Collection of Primary and Secondary data for preparation of application

  • Preparation of Form 1, Form 1A and Conceptual Plan

  • Baseline data (Air, Water, Soil and Noise testing) generation for preparing technical reports

  • Socio-economic Study

  • Impact Analysis by Experts

  • Submission of Form 1, Form 1A and Conceptual Plan along with supporting documents

  • Technical Presentation to the Concerned Authorities

  • Obtaining Environmental Clearance

Design Review and Issuance of Structural Stability Certificate

  • Consultant to review structural design of various sign boards/ hoardings to be erected on structure of Jaipur Metro Station and check effect of boarding on Steel Box Girder on central part of Elevated Station building.

  • Consultant to issue structural stability certificate along with design details.

Techno-economic feasibility studies of Integrated Municipal Solid Waste Management for four Municipalities in Democratic Republic of Congo, Africa

  • Situation analysis and need assessment,

  • Waste quantification and characterisation

  • Design of collection and transportation system

  • Design of Processing and disposal facility including Compost RDF Plant and Sanitary landfill

  • Project costing and financial modelling

  • Information, Education and Communication (IEC)

  • Environmental impact and mitigation measures

  • Various development options

Prebid Engineering and Estimation of Comprehensive EPC bid for 200 MLD Sea Water Desalination Plant at Qurayyat, OMAN.

  • Civil and Structural design and submission of K floor slab reconstruction drawings

  • Design Drawings of GRP lining

  • Design drawings of reinforcement bars installation

  • Method Statement and risk assessment for preparation, construction and testing

  • Detailed description of equipment intended to be used

  • Construction work program

  • K floor slab and nozzles installation and casting procedure

  • Preparation of BOQ for Civil and Structural works