1065, 10th Flr, Tower B1, Spaze i-Tech Park, Sector 49, Sohna Road, Guragon 122018, Haryana
+91 98106 32693 | info@infraplus.co.in
Techno Economic Feasibility Study, Master Planning and Design of Infrastructure Services of Green Agro Allied Economic Zone, Abuja Kaduna Expressway, Kaduna (1510 Ha), Kaduna, Nigeria
Techno Economic Feasibility Report
Market Research
Master Planning
Development of Katsina Green Industrial Park, 800 Hectare (2000 Acres) at Katsina, Nigeria
Techno Economic Feasibility Report
Market Research
Master Planning
Design and Detailed Engineering of Infrastructure Services
Design of Social Infrastructure Services
BoQ, Cost Estimation and Preparation of Tender Documents
Site Inspection
Services Designed
Road Network, Water Supply System, Sewerage Network, Storm Water Drainage, WTP and CETP, Boundary Wall, Gate Complex, Electrical distribution system, Sub-stations, Street Lighting, Single Window Clearance Building, Landscaping
Industrial Clusters Designed
Solar Park
Multi Model Logistic Park (MMLP)
General Engineering Cluster
Fashion / Apparel Cluster
Multi Product Cluster
Mega Food Cluster
Animal Food Processing Cluster
Flatter Factory Cluster
Techno Economic Feasibility Study, Master Planning and Design of Infrastructure Services of Green Economic Zone, Maraban Jose, Kaduna (310 Ha), Nigeria
Techno Economic Feasibility Report
Market Research
Master Planning
Development of Textile Park (33 Acres) at Ranchi, Jharkhand for Orient Craft Ltd.
Master Planning
Design and Detailed Engineering of Infrastructure Services
Design of Social Infrastructure Services
BoQ, Cost Estimation
Preparation of Tender Documents
Procurement Support to client in awarding works and arranging materials.
Project Management
Services Designed
Road Network, Water Supply System, Sewerage Network, Storm Water Drainage, WTP and CETP, Boundary Wall, Gate Complex, Electrical distribution system, Sub-stations, Street Lighting etc.
Preparation of DPR of 2 Bus Terminals in Andaman & Nicobar and Tripura, India
Preparation of Layout plans of New Bus Terminals
Planning of Internal circulation pattern-flow of passengers, vehicles and other vehicles, Requirements for vehicle bays, fuel station and maintenance depot, facilities and amenities required for passengers, commercial space etc.
Assessment of utilities: Power, water, rainwater harvesting, HVAC, ETP etc.
Prepare 3D views of the concept plan
Modify the conceptual designs incorporating changes and prepare the preliminary drawings, sketches, study model for approval of client along with cost estimates.
Detailed design and layouts for all architectural and structural work, Schedule of finishes
Preparation of BOQ and estimation of Project Cost as per the prevailing Schedule of Rates for the state.
Development of Technical schedules of the EPC agreement
Providing assistance in bid process management
Feasibility Study of Two Bus Terminals in Punjab and UP, India
Site assessment and potential connectivity with other modes of transport
Utilities assessment like power and water availability
Analysis of traffic movement and collection of primary data viz. vehicle trips, vehicle schedule, entry fee etc.
Environmental issue and mitigation measures
Study of local development plans, building by-laws, city development plan etc.
Identification of commercial development in the site vicinity, collection of real estate primary data e.g. Rentals for shops, Office spaces, malls, circle rate and market rates assessment etc.
Identification of issues impacting the site feasibility for proposed development of project site and suggesting measures to improve the site feasibility.
Design Review, Project management and Construction Supervision of BPCL Gas Pipeline Shifting work for NHAI in NCR (Dwarka Expressway)
Taking all approval from BPCL / NHAI for the pipe procurement
Design review and Value Engineering
Review and Approval of drawings and documents submitted by Supplier and Contractor
Review of Contractor’s shop drawings and providing approval
Scheduling and Budgeting
Full time Construction Supervision and bill certification
IQuality assurance and quality control
Environment, Health and Safety Management
Monitor & Supervise Testing and Commissioning of pipelines
Final bill certification and getting as built drawings prepared
Electricity Consultancy Services and Engineering Support for External Electrification work and low voltage works of Suncity Hitech Township at Vrindavan Mathura
Preparation of design drawings showing high tension, low tension system and distribution etc. as per preliminary design report
Preparation of Schematic diagram for power distribution and low voltage system, lighting arrestors etc.
Preparation of coordinate working drawings of all types of electrical systems as per preliminary report.
Preparation of Detailed cost estimates on the basis of the market rates
Tender documents including special conditions of contract, technical specifications and detailed scheme of quantities on the basis of approved drawings.
Providing all required technical assistance to arrange the approvals of all systems from the client.
Feasibility Study for Development of Medical and Health Park on 400 acres area in UP
Need assessment of Medical & Health Park
Preparation of Conceptual layout
Details of various units and facilities required – Super-specialty hospitals, National Centre for Infectious Diseases, Medical College, Nursing College, Ayurvedic/ Yunani/ specially hospitals, Diagnostic facilities, Clinical Support Services, Wellness Centre, Research & Development Centre, Herbal Park, Residential Township, Hotels, Commercial complex, Amenities and Utilities, Helipad etc.
Feasibility Study of Four Food/ Agri Processing Plants (Banana, Tomato, Potato & Cashew) in Senegal, Africa
Industry overview and Sector analysis
Raw material and availability, Value Chain assessment
Global and regional production and consumption analysis
Detailed supply chain analysis including small scale farmers, farmer groups, Cooperative, SHG, Traders, Exporter etc.
Details of Field collection centers, Primary processing centers, Processing centers, warehouse, cold storage, market etc.
Market Potential – Present Market Position and Expected future demand
Integrating smallholder farmers to market approach
Backward and forward linkages of/from products to market processing
Manufacturing Process, Process flow sheet diagram, plant layout
Details of capital investment: Land and site development cost, Buildings and Civil Works, Plant and Machinery, Miscellaneous fixed assets
Project Economics and profitability analysis
Pre-bid Consultancy Services for Vikram Udyogpuri Infrastructure Development Project in Ujjain, MP.
Preparation of detailed BOQ with description of all items of the tender document (co relating with specifications and tender drawings)
Preparation of Design Basis Report (DBP)
Preparation of Detailed cost estimates on the basis of the market rates
Preparation of broad technical data of equipment required in the project
Detailed Schedule of items and submission of quantity take off sheets
Market Potential – Present Market Position and Expected future demand
Develop Enterprise based Plastic Collection System with focus on Inclusion activities for Informal Waste Sector in Multiple Cities across India
Key objectives of this assignment is to identify, invest and build a systematic plastic collection systems and streamlining activities in informal collection system through focus on inclusion activities for informal waste sector.
Focus states - Maharashtra, Delhi, Rajasthan, Haryana, Andhra Pradesh, Telangana, Karnataka, West Bengal, Kerala, Uttar Pradesh, Madhya Pradesh, Orissa and Tamilnadu.
Project Management Consultancy for various CNG Gas Stations of IGL
Planning, Scheduling & Reporting of timelines for timely completion of activities.
Detailed Engineering of CNG stations which includes provision of recommendation and improvements, monitoring individual tasks and optimize site procedures.
Preparation and improvements of Construction Procedures, Quality Assurance Manual, SOPs, QAPs & ITPs etc.
Review contractor’s resources and schedule on daily basis and Coordinate with contractors/ IGL.
Carry out construction supervision activities based on approved construction drawings.
Inspection of day-to-day activities at site and signing of reports.
Assist in lesioning with land owning agencies and day to day coordination with authorities.
Follow up with vendors for As Built drawings/ documents, review/ approve and forward the same to IGL with in the stipulated time.
Independent Engineer for Municipal Solid Waste Management Project, Dehradun
BOT project of Waste Processing plant
Pre-dispatch material supervision
Construction quality supervision of trommels, sanitary landfill for 200 TPD waste to compost plant
Billing Certification
Weigh bridge supervision
QA/QC
Transaction Advisory Services for a Waste to Energy Plant in India
Due diligence of the waste market in the catchment area of the target asset
Technical due diligence of the plant and its operations
Coordination with various other advisors
Interface with Seller and bank for the closure of deal
Advise on local issues and other operational issues related to project
Consultancy services for obtaining Environment Clearance for Commercial Project in Faridabad
Collection of Primary and Secondary data for preparation of application
Preparation of Form 1, Form 1A and Conceptual Plan
Baseline data (Air, Water, Soil and Noise testing) generation for preparing technical reports
Socio-economic Study
Impact Analysis by Experts
Submission of Form 1, Form 1A and Conceptual Plan along with supporting documents
Technical Presentation to the Concerned Authorities
Obtaining Environmental Clearance
Design Review and Issuance of Structural Stability Certificate
Consultant to review structural design of various sign boards/ hoardings to be erected on structure of Jaipur Metro Station and check effect of boarding on Steel Box Girder on central part of Elevated Station building.
Consultant to issue structural stability certificate along with design details.
Techno-economic feasibility studies of Integrated Municipal Solid Waste Management for four Municipalities in Democratic Republic of Congo, Africa
Situation analysis and need assessment,
Waste quantification and characterisation
Design of collection and transportation system
Prebid Engineering and Estimation of Comprehensive EPC bid for 200 MLD Sea Water Desalination Plant at Qurayyat, OMAN.
Civil and Structural design and submission of K floor slab reconstruction drawings
Design Drawings of GRP lining
Design drawings of reinforcement bars installation
Method Statement and risk assessment for preparation, construction and testing
Detailed description of equipment intended to be used
Construction work program
K floor slab and nozzles installation and casting procedure
Preparation of BOQ for Civil and Structural works